Interstitial after level-fail: incremental revenue vs churn risk

Editorial collage hero: measurement-lab-interstitial-after-level-fail

Illustrative lab for interstitial-after-fail placement versus a no-interstitial control, anchored to AdMob interstitial and rewarded format definitions.

Placement choice is an operator lever. This lab compares interstitial-after-level-fail against a control using illustrative retention and eCPM inputs. It does not claim a genre-optimal placement.

Format definitions

AdMob interstitial ads define full-screen ads at natural transition points. Rewarded ads are a separate opt-in reward format — do not conflate fail-interstitial forced views with rewarded completes. AppsFlyer ad-revenue partner sharing documents af_ad_revenue for mediation revenue used in the IAA side of the readout.

Synthetic worked example

ArmInterstitial eCPMFail→interstitial rateD1 retentionIAA / install D1Notes
Control (no fail interstitial)—00.400.020Synthetic
Treatment (fail interstitial)8.000.550.360.048Synthetic

Illustrative treatment IAA uses impr_per_install × eCPM/1000 with impr_per_install = 0.55 × 1.1 (synthetic) → 0.605 × 8 / 1000 = 0.00484 scaled in CSV to cohort math — use CSV outputs. Directional lesson: incremental IAA can coexist with retention damage; register both before scaling.

OutputControlTreatment
D1 retention (input)0.400.36
Net IAA index (synthetic)1.002.40
Retention index1.000.90

Facts versus limits

FieldEvidence
Interstitial formatAdMob interstitial docs
Rewarded ≠ interstitialAdMob rewarded docs
Measured churn elasticityNot on cited pages

Download the lab card.

Related posts

Airbridge adds Amazon Ads as an app measurement channel

measurement

·

3 min read

Airbridge adds Amazon Ads as an app measurement channel

When to freeze a cohort for payback review (and when not to)

measurement

·

2 min read

When to freeze a cohort for payback review (and when not to)

Using predicted LTV in bids: disclosure checklist for the UA team

measurement

media buying

·

1 min read

Using predicted LTV in bids: disclosure checklist for the UA team